home about the product how it happens frequently asked questions contact us
 
Overview
Applications

Our revolutionary yet simple design uses friction pile principles with final screw down locking to provide footings for housing, decking and various other structures as a substitute for concrete slabs, brick piers or stumps. We provide full engineering, supply and installation services state wide and issue compliance certification to satisfy Council requirements.

Builders from the south who have used the system comment:


“Being a traditional builder, I was a little reluctant to try alternative products, but we did and i am delighted with the results. We reduced our downtime by 60% and saved 50% on our budget to floor stage”.

Graham Cooper from Cooper Builders

“For quite a large deck on a difficult slope we were able to have footings installed and then complete the whole job on the same day”.

Matthew Wilson from Wilson Kapitelli Constructions

“It's so easy, we saved 25% on conventional methods and structurally it's very sound”.

Geoff Madden from Traditional Timber & Kit Homes

  • Ideal in a vast range of situations from difficult access sites, environmentally sensitive areas, Ecotourism projects, transportable buildings through to fast and efficient decking jobs
     
  • This galvanised steel system accomodates either timber or steel subfloor structures. It is designed to suit all sites including many problematic soil types.
     
  • Guaranteed to be the quickest, cleanest, easiest and most cost effective solution for your project. An average house can be completed in one day.
  • For accurate cost estimation all we need is a copy of your plans showing floor plan and elevations, accompanied by the soil report. We provide engineering computations and certification for submission to Council to take care of building surveyor approval.
     
  • Statewide service is available.

Winner of numerous awards
  • HIA Greensmart Product of the Year Award
  • HIA Product Innovation Award
  • BHP Best New Building Product

  o no concrete
o
no site preparation
o
no holes
o
no council delays
o
no excavator
o no mess
  Copyright (c) 2003 - CV Substructure Systems . Designed and Developed by Exigent Studios